Relevant cost
Relevant cost, also known as differential cost, is an accounting term that is used to refer to costs that pertain to a particular decision. This means that those costs could be avoided depending on whether the decision is taken. Relevant costs will differ between the alternative options being considered.
By identifying the relevant costs that relate to a particular decision, cost information that is common to all options, and so not relevant to the decision can be removed; these are referred to as irrelevant costs. Time and effort can be saved by distinguishing between relevant and irrelevant costs when analysing options.
Relevant costs are typically considered in two categories:
- Future cost: The cost that will be incurred in the future as a result of the decision (If this future cost does not change based on the decision then it is an irrelevant cost).
- Opportunity cost: The amount that will be lost in terms of missed opportunities as a result of the decision.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.